A Ellery company - serving Huntington Beach, CA
Garage Conversion ADU in Costa Mesa, CA | Ellery ADU Studio Huntington Beach

Garage Conversion ADU in Costa Mesa - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

21+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable Garage Conversion ADU Across Costa Mesa

A garage conversion ADU in Costa Mesa typically runs $95,000-$185,000 all-in, from measured drawings through final inspection, with most projects completing in 6-10 months depending on long-lead finishes. We’re Ellery ADU Studio, and our Garage Conversion ADU in Costa Mesa team coordinates design, permitting, and construction under one written contract at one fixed price. Dispatch and scheduling run from our Los Angeles office, but our crews serve Costa Mesa neighborhoods directly - from the Eastside ranches off Joann Street to the Westside bungalows west of Harbor Boulevard. Call (562) 263-3350 to schedule your free estimate, or bring us any written estimate already in hand for a Free Second Opinion.

Call (562) 263-3350

Why Ellery ADU Studio Huntington Beach Is Costa Mesa’s Preferred Garage Conversion ADU Company

We’ve handled Costa Mesa ADU Design & Permitting for more than 900 ADUs since 2015, the year California’s ADU laws shifted, and a significant share of those have been garage conversions in Costa Mesa’s postwar neighborhoods. Our clients here receive a written price before any work starts, per Haven Standard Clause 1, plus a documented photo record on every visit and the 365-Day Done Right Promise backed in writing.

Costa Mesa homeowners find us because they have already read the three-star reviews elsewhere and want something documented. Our license number appears on every page, verified, not just claimed. Background-checked, uniformed crews handle the work. A live person answers calls 24/7 - no voicemail queue, no callback promise that doesn’t materialize.

What separates us in this market is local permit fluency. Costa Mesa’s building department sits at 77 Fair Drive, and we know the inspectors who handle ADU conversions. More importantly, we know what they flag: slab moisture barriers on 1960s slabs, cast-iron drain line upgrades on Westside bungalows, and the airport land-use compatibility map for any project north of the 405. Out-of-area contractors routinely miss that last one until mid-permit.

Our Garage Conversion ADU Services in Costa Mesa

Construction worker sealing the floor base of a garage conversion project
Our Garage Conversion ADU Services in Costa Mesa

Attached Garage Conversion

Attached garage conversions are the most common ADU type we build in Costa Mesa, and for good reason. The city’s R1 lots - typically 6,000-8,000 square feet - are dominated by single-story wood-frame ranch homes built between 1955 and 1972, almost all with attached one- or two-car garages that share a wall with the main house. These conversions leverage existing foundation, roof structure, and utility stub-ins, which keeps the budget lower than a ground-up build. On the Eastside, where near-Newport rental premiums apply, a converted attached garage often pencils at rental yields that would be impossible in Santa Ana or Huntington Beach. We handle the full permit set, Title 24 energy calculations, and the HCD checklist if you’re pursuing a Junior ADU classification.

Attached Garage Conversion

Detached Garage Conversion

Detached garage conversions appear more often on Costa Mesa’s Westside, where the 1940s-50s bungalows on slightly deeper lots sometimes have rear-yard garages or outbuildings. These projects typically require more extensive utility trenching - electrical, water, sewer - and often surface as part of a larger site plan that includes driveway reconfiguration or setback adjustments. The advantage is privacy: a detached ADU rents as a standalone unit, not a spare room with a separate entrance. We pull the full permit set, including any setback variance - the extra distance the city requires between your new ADU and the property line - and coordinate with Costa Mesa’s planning counter if your lot coverage approaches the maximum.

Detached Garage Conversion

Garage Partition & Bathroom Add

Not every Costa Mesa homeowner wants a full ADU. Some partition the garage to add a bathroom and a small kitchenette, creating a flexible space for family, a home office, or future rental conversion. This approach works well on the smaller Eastside ranches where a full ADU would consume too much of the lot coverage allowance. We design the partition as a non-load-bearing assembly that can be removed later if you upgrade to a full conversion, and we rough in plumbing for the eventual kitchen stack. The permit set includes both the current scope and the future-state plan, so you’re not starting over when you’re ready to expand.

Garage Partition & Bathroom Add

Carport Conversion

Carport conversions are less common in Costa Mesa but appear occasionally on Westside lots where a previous owner removed the garage door and left a roofed, open structure. These require full enclosure - walls, insulation, vapor barrier, and often a new slab or stem-wall foundation if the existing carport slab lacks the depth for habitable space. We evaluate the existing structure for lateral load capacity, since carports were rarely engineered for the wind and seismic requirements that apply to ADUs.

Carport Conversion
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (562) 263-3350

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Costa Mesa

Our Garage Conversion ADU team specifies and coordinates prefab and modular systems from Plant Prefab, Tuff Shed, and James Hardie within the same single contract that covers your design and permitting. For Costa Mesa’s marine-layer climate, we default to James Hardie fiber-cement siding on any exterior wall modification - it handles the persistent humidity far better than wood or vinyl. Plant Prefab’s panelized systems can accelerate enclosure on detached conversions where weather-tightness is critical. We don’t drop-ship; we coordinate delivery to your Costa Mesa lot and integrate the system into our construction schedule, with the price fixed in writing before any order is placed.

Common Garage Conversion ADU Problems We See in Costa Mesa Homes

Contractors installing metal framing and electrical work for garage conversion ADU
Common Garage Conversion ADU Problems We See in Costa Mesa Homes
  • Airport sound-attenuation scope missed north of the 405. Parcels in the John Wayne Airport influence area trigger upgraded glazing, insulated exterior walls, and mechanical ventilation in lieu of operable windows. Contractors who don’t pull the airport land-use compatibility map before finalizing scope get caught mid-permit, and the re-price hits the homeowner.
  • Slab moisture treated as an afterthought. Costa Mesa’s year-round marine-layer humidity, drawn in from the Pacific just 2-3 miles away, condenses on garage slabs with no original vapor barrier. Without cutting and re-pouring a moisture barrier and installing code-compliant exhaust ventilation, mold grows behind custom millwork and drawers.
  • Schedule driven by labor instead of long-lead items. Designer-specified architectural glass, rift-oak cabinetry, and European hardware can run 12-16 weeks. A contractor who hasn’t fixed the price in writing before placing those orders leaves the homeowner exposed when finishes or freight move.
  • Aging infrastructure on Westside conversions. The 1940s-50s bungalows west of Harbor Boulevard routinely need electrical panel upgrades from 100-amp to 200-amp service and cast-iron drain line replacement to ABS - scope that should be in the original permit set, not a change order.
Get the price in writing before anything starts.Serving Costa Mesa - a real person answers, day or night.
Call now

Pricing for Garage Conversion ADU in Costa Mesa, CA

Service Typical Range in Costa Mesa
Attached garage conversion, standard finish $95,000 - $140,000
Attached garage conversion, high-end finish (custom millwork, architectural glass) $145,000 - $185,000
Detached garage conversion $110,000 - $165,000
Garage partition & bathroom add $45,000 - $75,000
Carport conversion (full enclosure) $85,000 - $130,000

These ranges include design, permit set, construction, and final inspection. What moves a Costa Mesa project toward the top of the range: sound-attenuation upgrades for airport-influence parcels, slab moisture-barrier work on 1960s slabs, custom millwork and long-lead finishes, and aging infrastructure replacement on Westside lots. Every project is quoted with a written price before any work begins, per Haven Standard Clause 1. No “call for a quote” - the number is on the page, and the exact figure for your project comes after we measure and specify. Call (562) 263-3350 for your free estimate.

We Also Serve Cities Near Costa Mesa

Professional reviewing ADU architectural plans and land survey on a laptop
We Also Serve Cities Near Costa Mesa

Our crews work throughout central Orange County, including Costa Mesa and the surrounding cities of Fountain Valley, Newport Beach, Santa Ana, and Huntington Beach. Each city’s permit environment, housing stock, and rental market differ, and we adjust our permit sets accordingly - Santa Ana’s inclusionary housing requirements, Newport Beach’s stricter design review, Huntington Beach’s coastal zone overlays.

Serving Costa Mesa, CA - Our Local Coverage Area

We’re based in the Costa Mesa area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in Costa Mesa

Technician installing HVAC unit during a garage conversion project
FAQs - Garage Conversion ADU in Costa Mesa

What Costa Mesa Customers Say

Trusted by homeowners across Costa Mesa and surrounding areas.

★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer
★★★★★

"Handled the whole planning process. We went to one hearing and that was it."

Rowena C. · Verified customer
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer

Why Costa Mesa Chooses Ellery ADU Studio Huntington Beach

We set the standard for garage conversion adu in Costa Mesa.

Fast Huntington Beach Permit Turnaround

Our familiarity with the City of Huntington Beach planning department means we submit complete, correctable packages that move through approval faster than first-time applicants.

Designs Suited to HB's Coastal Character

We craft ADU aesthetics that complement existing Huntington Beach architecture - from beach bungalow to contemporary coastal - so your addition enhances the whole property.

Trusted by HB Homeowners

Our reputation in Huntington Beach is built entirely on referrals and repeat clients - a reflection of the care and quality we deliver on every single project.

How It Works in Costa Mesa

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Costa Mesa - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Ready for Garage Conversion ADU in Costa Mesa?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Costa Mesa.

(562) 263-3350

Request a Free Estimate in Costa Mesa

Tell us about your garage conversion adu needs - we'll respond within the hour.

By providing your information above, you acknowledge our Privacy Policy and authorize us to contact you via phone, email, or SMS about your request, including by the independent professionals who may fulfill it.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch